Runtime material

Revision as of 17:42, 27 July 2015 by Kheitmann (talk | contribs)

Layout for Runtime material

A publication page (see figure) will usually also contain a project validation runtime set, short "Runtime" materials that are generated by ART-DECOR, mainly schematrons. Optional items are marked as <optional>

  • En project publication 04.jpg

Please note that in the following lists

  • projectprefix means the respective project prefix, e.g. demo3 or ccda,
  • datetime is the time stamp of that version or release, and
  • transactionlabel is the label given in the transaction that defines the representing template.

The Runtime material set (downloadable as a zip file) contains the following folders and files.

  • Error creating thumbnail: Unable to save thumbnail to destination
    projectprefix-runtime-datetime - The folder with a sub-structure (see below) with all schematrons.
  • Error creating thumbnail: Unable to save thumbnail to destination
    projectprefix-runtime-datetime.zip - The folder above but zip-compressed
  • Error creating thumbnail: Unable to save thumbnail to destination
    projectprefix-datetime.pdf <optional> - The generated PDF.

The runtime folder consists of the following sub-structure:

  • Error creating thumbnail: Unable to save thumbnail to destination
    projectprefix-transactionlabel.sch - A set of files as the root schematron, uses/includes files from the 'include folder.
  • Error creating thumbnail: Unable to save thumbnail to destination
    include
  • Error creating thumbnail: Unable to save thumbnail to destination
    schematron_svrl - contains the schematron translated to XSLTs that generate pure SVRL, for more information see http://www.schematron.com/implementation.html
  • Error creating thumbnail: Unable to save thumbnail to destination
    schematron_text - contains the schematron translated to XSLTs that generate pure text