Runtime material
Layout for Runtime material
A publication page will usually also contain a project validation runtime set, short "Runtime" materials that are generated by ART-DECOR, mainly schematrons. Optional items are marked as <optional>
Please note that in the following lists
- projectprefix means the respective project prefix, e.g. demo3 or ccda,
- datetimeis the time stamp of that version or release, and
- transactionlabel is the label given in the transaction that defines the representing template.
The Runtime material set (downloadable as a zip file) contains the following folders and files.
- Error creating thumbnail: Unable to save thumbnail to destinationprojectprefix-runtime-datetime - The folder with a sub-structure (see below) with all schematrons.
- Error creating thumbnail: Unable to save thumbnail to destinationprojectprefix-runtime-datetime.zip - The folder above but zip-compressed
- Error creating thumbnail: Unable to save thumbnail to destinationprojectprefix-datetime.pdf <optional> - The generated PDF.
The runtime folder consists of the following sub-structure:
- Error creating thumbnail: Unable to save thumbnail to destinationprojectprefix-transactionlabel.sch - A set of files as the root schematron, uses/includes files from the 'include folder.
- Error creating thumbnail: Unable to save thumbnail to destinationinclude
- Error creating thumbnail: Unable to save thumbnail to destinationschematron_svrl - contains the schematron translated to XSLTs that generate pure SVRL, for more information see http://www.schematron.com/implementation.html
- Error creating thumbnail: Unable to save thumbnail to destinationschematron_text - contains the schematron translated to XSLTs that generate pure text