Runtime material

Revision as of 17:38, 27 July 2015 by Kheitmann (talk | contribs)

Layout for Runtime material

A publication page will usually also contain a project validation runtime set, short "Runtime" materials that are generated by ART-DECOR, mainly schematrons. Optional items are marked as <optional>

The Runtime material set (downloadable as a zip file) contains the following folders and files. Please note that projectprefix means the respective project prefix, e.g. demo3 or ccda, datetimeis the time stamp of that version or release, and transactionlabel is the label given in the transaction that defines the representing template.

  • Error creating thumbnail: Unable to save thumbnail to destination
    projectprefix-runtime-datetime - The folder with a sub-structure (see below) with all schematrons.
  • Error creating thumbnail: Unable to save thumbnail to destination
    projectprefix-runtime-datetime.zip - The folder above but zip-compressed
  • Error creating thumbnail: Unable to save thumbnail to destination
    projectprefix-datetime.pdf <optional> - The generated PDF.

The runtime folder consists of the following sub-structure:

  • Error creating thumbnail: Unable to save thumbnail to destination
    projectprefix-transactionlabel.sch - A set of files as the root schematron, uses/includes files from the 'include folder.
  • Error creating thumbnail: Unable to save thumbnail to destination
    include
  • Error creating thumbnail: Unable to save thumbnail to destination
    schematron_svrl - contains the schematron translated to XSLTs that generate pure SVRL, for more information see http://www.schematron.com/implementation.html
  • Error creating thumbnail: Unable to save thumbnail to destination
    schematron_text - contains the schematron translated to XSLTs that generate pure text